The Project site is located in a previously disturbed area on the Morongo Indian Reservation north of the Seminole Drive traffic circle. The EA supports a Finding of No Significant Impact (FONSI). This EA documents the environmental review of a proposal by the Tribe to develop a 23-acre Project site to accommodate two standalone hotels, approximately four standalone pad (standalone sites typically located within a parking lot upon which a customized space can be built and/or leased for a tenant) type retail outlets, and three standalone office spaces. As the Lead Agency, the Morongo Band of Mission Indians (Tribe) hereby provides this Notice of Availability of a Final Draft Environmental Assessment (EA) for the Morongo Hotel Project.